Delfzijl, 9/6/2010 – In a record time of less than two days the next generation PSV “Caballo Siete Leguas” has finished her seatrials. The vessel shall now be prepaired for her delivery and trip to Mexico/Cuidad del Carmen.

Back to news ↗


Delfzijl, 9/6/2010 – In a record time of less than two days the next generation PSV “Caballo Siete Leguas” has finished her seatrials. The vessel shall now be prepaired for her delivery and trip to Mexico/Cuidad del Carmen.