Foxhol 12/11/2014 – The separate tanks for the dry bulk system are placed in the partially finished hull for Yard Number 470. The vessel is under construction at our yard in Foxhol.

Back to news ↗


Foxhol 12/11/2014 – The separate tanks for the dry bulk system are placed in the partially finished hull for Yard Number 470. The vessel is under construction at our yard in Foxhol.